Home

  1. News Flash
  2. Master Calendar
  3. Recycling Calendar
  1. 5 Additional Positive Cases and 32 Previously Unreported Cases of COVID-19 in the Town of Shrewsbury

    IMPORTANT NOTE: Please be advised that the Town of Shrewsbury is reporting a higher increase of total positive cases of COVID-19. Click the link for the press release. Read on...
  2. Statement Regarding the Recent Death of George Floyd and the Resulting National Protests

  3. Selectmen Selections - May 2020

  4. Important Notice from the Water & Sewer Division - Fire Flow Testing on June 4, 2020

    On Thursday, June 4, 2020, at approximately 1:00 p.m., flow testing of the water distribution system will be conducted near Pinedale Road. This testing is necessary to gather important water flow data for the fire suppression system at this address. Read on...
  5. Important Notice from the Shrewsbury Water and Sewer Division - Overnight Water System Work on 6/4

    On Thursday night, June 4, 2020, starting at 9:00 p.m., ET&L will be connecting the new water main installed at the bridge on Rte. 140 over Rte. 290 and must turn off the existing main in that area. The project is expected to be be completed by 5:00 a.m. Read on...
  6. Shrewsbury Town Buildings Closed to the Public through June 5, 2020

    Shrewsbury Town Buildings Closed to the Public through June 5, 2020 Read on...
  7. Re-opening MA - Phase II: "Cautious" Effective Date TBD

    Under a staggered approach, Phase II sectors of the economy as determined by the State will be permitted to open at a date to be determined (with restrictions and some capacity limitations). Read on...
  8. Shrewsbury Completes Solar Array at Home Farm Water Treatment Plant

    The Town of Shrewsbury Completes Solar Array at the Home Farm Water Treatment Plant as part of Improvements Project Using Grant Funds from the MA Department of Environmental Protection Read on...
  9. Project Approval and New Speed Limit along Route 20

    A new speed limit of 45 MPH is in place along Route 20 in Shrewsbury beginning at the Northborough town line for approximately 3 miles. Read on...
  10. Important Notice from the Water & Sewer Division - Fire Flow Testing on June 2, 2020

    On Tuesday, June 2, 2020, at approximately 1:00 p.m., flow testing of the water distribution system will be conducted near 820 Boston Turnpike. This testing is necessary to gather important water flow data for the fire suppression system at this address. Read on...
View All